Switching Cleaning Providers? What Facilities Managers Ask Us

What should you check before you change facilities provider?

Start with the risk controls: your current contract, the real service gaps, staff transfer, mobilisation and reporting after go-live. Switching facilities management provider is manageable when we know what has failed, what must continue and who owns each decision before the new contract starts.

The question we hear in practice is simple: what could go wrong if you change provider, and how do you stop the handover creating a new problem?

A low price rarely answers that. Your issue may be poor supervision, a weak specification, missed reporting or a contract that never made accountability clear. Changing FM supplier only works when the incoming provider has enough evidence to fix the right problem.

We look for the points that affect service on day one: who attends site, what they are expected to do, how issues are logged and who makes decisions when something slips.

Facilities Manager Discussing Cleaning Contract at Building Entrance - Illustrative Image

Facilities Manager Discussing Cleaning Contract at Building Entrance – Illustrative Image

i 3 What Do We Cover In This Article?

The current contract sets the switching risk

Your switch starts with the agreement you already have. Before we judge any new proposal, we need to understand the notice terms, exit provisions, service scope and site evidence held under the current facilities management contract.

Many switching problems begin because the outgoing supplier, the incoming provider and the buyer are working from different versions of the job. A signed contract may say one thing, a later variation may say another, and the site log may show a third version in daily practice.

Check these items before you assume the change is straightforward:

  • Notice and termination terms. Confirm how notice must be served and whether any agreed variation changed the original position.
  • Exit provisions. Look for wording on cooperation during transition, because the Cabinet Office Contract Management Playbook treats collaboration between previous and new suppliers as good practice during handover.
  • Service scope. Compare the written duties with what actually happens on site, especially where switching cleaning contractor or changing security provider follows repeated complaints.
  • Performance evidence. Pull together missed tasks, missed shifts, site logs and escalation records, because frustration alone gives the incoming team too little to work with.
  • Site-level differences. Separate the sites that are failing from those that are stable, because one poor location can distort your view of the whole contract.

Exit fees need the same discipline. We would check the signed agreement, termination wording, notice provisions and agreed changes before assuming a charge applies. That review tells the new provider where continuity matters and where the service needs a hard reset.

Mobilisation controls continuity before go-live

Mobilisation is the work between contract award and go-live. The Contract Management Playbook describes it as the period that prepares both sides for the start date, and it often runs at the same time as the existing supplier’s exit.

Service continuity during handover comes from preparation you can inspect. We want the provider mobilisation plan to show how the site will be reviewed, how the written specification will be set, and how rota cover will work before the first shift or clean.

A controlled FM takeover process normally follows a clear order:

  • Review the site and contract evidence. Walk the site, check access arrangements and match the written scope to what the building actually needs.
  • Write the specification. Set out duties, frequencies, patrol routes where relevant and escalation lines in plain terms.
  • Plan staff transfer where it applies. TUPE, which means Transfer of Undertakings (Protection of Employment), may need to be handled where staff move across.
  • Arrange mobilisation. Confirm induction records, rota cover, keyholding arrangements and the account route before go-live.
  • Review after start. Check early performance against the specification and correct gaps while they are still visible.

At Double Check Security Group, we structure our own facilities management takeover around a site assessment, an integrated plan, TUPE and mobilisation where staff transfer, and one account manager after go-live. That model matters because cleaning, security and building operations all rely on local knowledge.

Occupied and public-facing premises need particular care. A cleaner may need access before trading starts, while a security officer may need assignment instructions for a rear entrance that rarely appears on a floor plan. Those details belong in mobilisation, because day one is too late to find them by trial and error.

Facilities Manager Discussing Commercial Cleaning Requirements - Illustrative Image

Facilities Manager Discussing Commercial Cleaning Requirements – Illustrative Image

Pro Tip: Ask for the live site log from the outgoing provider before mobilisation starts. It often shows the routine exceptions, access quirks and repeat issues that never make it into the formal scope.
Joe Bugner

Director, DCS Group Ltd

Staff transfer changes supervision first

You may change provider and still see some familiar people arrive for the first shift. Acas guidance says TUPE can apply when a contract is retendered and taken over by a new contractor, and service provider changes often include security and office cleaning contracts.

That is why staff transfer facilities management questions need calm handling. The buyer does not need a lecture on employment process. You need to know that the incoming contractor can manage records, induction, expectations and rota control without letting the service drift.

Performance improves through supervision, induction and rota control, not through changing the logo on the contract.

Security adds another check. The Security Industry Authority (SIA) says an individual licence may be needed where security work is supplied under a contract for services and involves licensable activity, including manned guarding, key holding and public space surveillance CCTV. Individuals hold SIA licences, while companies hold SIA Approved Contractor Scheme (ACS) approval.

Double Check Security Group Ltd t/a T-Class UK currently holds SIA Approved Contractor Scheme status for the provision of Door Supervision and Security Guarding. The current SIA register entry shows an expiry date of 30 November 2027.

Licence checks still sit at person level. If your site needs licensable security work, we check that the individual officer is allowed to carry out the assigned role and that the site instructions match what the contract authorises.

One accountable owner makes bundled services work

Moving cleaning, security and building operations to one provider has obvious appeal. You reduce supplier meetings, invoice handling and the daily question of who owns a cross-service issue. The gain only appears when the contract gives one person the authority to manage the whole service.

The table below compares separate suppliers with one accountable provider.

ModelWhat it can improveWhat to check
Separate suppliersSpecialist focus for each serviceWho coordinates issues across cleaning, security and FM
One accountable providerFewer handoffs, one invoice and one escalation routeWhether service standards, reporting and ownership are documented

One provider reduces coordination work only when the contract has one owner, not when several services are simply grouped under one invoice.

Our integrated facilities management services bring security, cleaning and building operations under one contract model. Security and cleaning are delivered in-house, while hard FM is delivered or managed within the same contract. That structure reduces buyer workload when the reporting route, service standards and account ownership are written down.

Cost comparison needs the same level of detail. We compare facilities management quotes by the hours required, the site risk, the licence type for security work, cleaning frequency, number of sites, travel, response expectations and reporting burden. A lower headline figure can hide missing supervision or weaker cover, so the useful comparison is the full operating shape behind the price.

Pro Tip: Keep a dated record of who approved each change to the specification after handover. That record helps if an issue later turns into a dispute over cost, frequency or responsibility.
Andy Bannon

Director, DCS Group Ltd

Proof after go-live keeps the contract honest

When the first shifts after go-live begin, the contract stops being theory. Attendance, task completion, incident reporting and escalation all need to show whether the facilities management transition has improved control.

Early facilities management reporting should be simple enough to use and detailed enough to act on. We want to see attendance records, missed task reporting, issue ownership and evidence that the account manager is correcting the specification where the first version missed something.

Good contract paperwork gives you a working audit trail. The Cabinet Office Contract Management Playbook lists items such as a contract management plan, risk register, payment tracker, obligations matrix, relationship management plan and issues log as documents that help monitor supplier performance and spend. Private buyers do not need to copy a public-sector manual, but the principle is useful: write down what matters, then use it.

The first review meeting should test the service in practice. Did the right people attend? Were inductions completed? Did the escalation route work when tested? Did any site need a change to the specification? Those answers are more useful than a polished mobilisation pack once the contract is live.

Future exit planning also starts early. The same Playbook says exit should be planned before contract award and considered through the life of the contract. A good new contract makes the next retender easier because the records already show what was agreed, what changed and what the service actually cost to run.

The provider decision that stands up at the next retender will be the one built around evidence from the start. Clean records, named ownership and visible corrections make a contract easier to manage long after the handover has passed.

Questions facilities managers ask us about switching provider

Should every site switch on the same go-live date?

A single go-live date can work for simple estates, but a phased change may suit mixed sites with different access, staffing or risk profiles. We judge that by how much site knowledge must be transferred before the first shift.

How should you handle sites that perform well under the current supplier?

Keep the evidence from those sites and use it to shape the new specification. A provider change should protect what already works, especially where local routines are part of the reason the service is stable.

Who should approve changes to the specification after handover?

One named account route should control specification changes, with your side agreeing anything that affects cost, frequency or risk. Informal changes made directly on site can cause disputes later.

What if your cleaning problem is linked to security access?

Treat it as one operational issue. If cleaners cannot access the right areas at the right time, the failure may sit in keyholding, access control or site instructions, rather than the cleaning task itself.

How much information should the outgoing supplier provide during handover?

The answer depends on the existing contract and its exit provisions. We would expect cooperation to cover the information needed for continuity, such as current routines, access arrangements and live site issues.

Need help today?

Speak to our team

Fast response, no long waits.

020 3794 8182 Message Us Online

DCS Group Ltd
Unit 6, Skyline business Village, London E14 9TS

020 3794 8182

Find us on Google Maps